10 Fenchurch Ave.jpg

10 Fenchurch Avenue

Completed 2019

TS Nexus were commissioned by the City of London Corporation to undertake the full design, supervision and management of the Section 278 Highway Works. 

 

Works included:

 

  • Preliminary Design

  • Detailed Design

  • 3D Level Design

  • Estimates

  • Construction Package

  • Stakeholder Liaison

  • Utility works

  • Site Supervision

  • Financial Monitoring

Aldgate Gyratory

Completed 2018

TS Nexus were commissioned by the City of London to undertake the detailed design and supervision of the  Highway Works.

 

Works included:

 

  • Preliminary Design

  • Detailed Design

  • 3D Level Design

  • Estimates

  • Construction Package

  • Stakeholder Liaison

  • Utility works

  • Site Supervision

  • Financial Monitoring

Aldgate.jpg

30-32 Lombard Street

Completed 2019

TS Nexus were commissioned by the City of London Corporation to undertake the full design, supervision and management of the Section 278 Highway Works. 

 

Works included:

 

  • Preliminary Design

  • Detailed Design

  • 3D Level Design

  • Estimates

  • Construction Package

  • Stakeholder Liaison

  • Utility works

  • Site Supervision

  • Financial Monitoring

30-32 Lombard Street.jpg