10 Fenchurch Avenue
Completed 2019
TS Nexus were commissioned by the City of London Corporation to undertake the full design, supervision and management of the Section 278 Highway Works.
Works included:
-
Preliminary Design
-
Detailed Design
-
3D Level Design
-
Estimates
-
Construction Package
-
Stakeholder Liaison
-
Utility works
-
Site Supervision
-
Financial Monitoring
Aldgate Gyratory
Completed 2018
TS Nexus were commissioned by the City of London to undertake the detailed design and supervision of the Highway Works.
Works included:
-
Preliminary Design
-
Detailed Design
-
3D Level Design
-
Estimates
-
Construction Package
-
Stakeholder Liaison
-
Utility works
-
Site Supervision
-
Financial Monitoring
30-32 Lombard Street
Completed 2019
TS Nexus were commissioned by the City of London Corporation to undertake the full design, supervision and management of the Section 278 Highway Works.
Works included:
-
Preliminary Design
-
Detailed Design
-
3D Level Design
-
Estimates
-
Construction Package
-
Stakeholder Liaison
-
Utility works
-
Site Supervision
-
Financial Monitoring